Tuesday, July 19, 2022

Yonge Street Window Installation - Construction Process

In order to create a structural frame and enclosure for the window installation, the fabrication team began construction using CNC milled plywood components. Once four panels were created, the team did a test build of the entire window enclosure on campus, which allowed for final touches to be completed before on-site installation. The team cut and built one window at a time, allowing for design and fabrication issues to be resolved at an earlier stage. 