Showing posts with label parking day. Show all posts
Showing posts with label parking day. Show all posts
Monday, September 22, 2025
Park(ing) Day 2025 | Final Images
We successfully completed Parking Day, and it was rewarding to see people interacting with the installation during the weekend activation. Developing the design as a team was a fun process, and the entire project became a valuable hands-on learning experience as the design came to life.
Friday, September 19, 2025
Park(ing) Day 2025 | Installation
The installation took place early in the morning and continued until noon. We started by building the base to fit the pre-assembled components. Once the base was secured, we connected the components while making final adjustments. It was exciting to see the project coming together!
Wednesday, September 17, 2025
Park(ing) Day 2025 | Assembly
The fabrication is now completed and the components are ready to be assembled. To make sure that the installation day goes smoothly, we preassembled into 7 components.
Wednesday, September 3, 2025
Park(ing) Day 2025 | Fabrication
With the design finalized, we started the fabrication. The work was divided into a few main tasks: cutting the pipes, building the chairs, and cutting the HDPE sheets using the CNC machine.
One of the biggest challenges was cutting the pipes, as the measurements had to be extremely precise to achieve the organic form.
One of the biggest challenges was cutting the pipes, as the measurements had to be extremely precise to achieve the organic form.
Sunday, August 17, 2025
Park(ing) Day 2025 | Final Design
After refining our proposals, we finalized the design using red pipes as the "wall" separating the project from the street. These pipes are organized in an organic mountainous shape, connected by a dense cloud of floating connecting pieces made of HDPE sheets. The thin connectors stabilize the structure but seem to disappear and reappear as people walk past them. The installation has multiple seating where visitors can sit and relax in groups or on their own.
Thursday, August 7, 2025
Park(ing) Day 2025 | Team Proposals
Students from Toronto Metropolitan University’s Department of Architectural Science are participating in Park(ing) Day 2025. The site is set on Gould st, in the middle of our campus.
The Parking Day event is a three day installation. The event allows us to repurpose the spaces used by cars for people to gather. We split into three teams and focused on making human-scale spaces while reusing materials leftover from previous design builds.
The Parking Day event is a three day installation. The event allows us to repurpose the spaces used by cars for people to gather. We split into three teams and focused on making human-scale spaces while reusing materials leftover from previous design builds.
Subscribe to:
Posts (Atom)
.jpg)
.jpg)


%20(1).jpg)
%20(1).jpg)
%20(1).jpg)


%20(3).png)


