Friday, May 15, 2026

Kickoff 2026 I Prototyping

Design is an iterative process, and every prototype brings the team closer to the final installation. This week the team continues testing, refining designs and collaborating to bring the installation one step closer to reality.

(Photos Taken By Andy Nguyen and Allie Male)



As the project has entered the construction phase, the team reaches an exciting milestone by completing the 1:6 physical scale prototype and begins preparing for the next phase of development. The team's focus had now shifted toward fabrication, testing and refining the technical details of the node connections.

Completed 1:6 Scale Model of the Kickoff Instillation

In collaboration with the shop supervisors, the team troubleshoots, refining fabrication methods, testing connection details and preparing components using the CNC machine. At the same time, Project Leads Saad Malik and Jose-Miguel Calle manage material orders and project timelines, gaining valuable project management experience required for a large-scale installation.

Students use CNC machine to begin prototyping node connections


 
Collaboration remains the heart of this project. Students have begun working alongside members of TMU's Engineering Department to develop and integrate the LED lighting system into the structure, ensuring the structure maintains the original design concept.



With each prototype and design review, students gain hands-on experience in fabrication, interdisciplinary collaboration, and iterative problem-solving. Each iteration provides new insight, allowing students to evaluate, improve and finalize the node and edge details before beginning fabrication of the full scale structure.

Students Gain Hands on Experience with New Tools Under the Guidance of Shop Supervisors


With the node and edge details finalized and fabrication underway, the team is ready to begin constructing the full-scale structure. Every prototype, meeting, and design revision has laid the foundation for the exciting work that is still to come.

Monday, October 20, 2025

Camp Winston Sensory Yurt Furnishings | Fabrication and Testing

With the design finalized, the team has officially begun fabrication. One of the biggest challenges has been determining in the right amount of kerfing to balance structural stability with the desired curve radius and material thickness. After thorough testing, we’ve determined the proper CNC intervals and cut depths to achieve a smooth curve while keeping the piece strong. To ensure smooth, timely installation up north, we completed as much fabrication in-house as possible before heading to site.

We sprayed the kerfed pieces with water and used an iron to increase the flexibility of the wood while minimizing breakage.


Monday, January 8, 2024

NOVA | Assembling One Module: Fabric, Pipe, and Nodes

With the layout, textiles, piping, and nodes figured out, the time has come to assemble one module at full-scale with final materials. This will be important to gauge whether the project is ready to be assembled in its entirety. A group of students assembled one module seamlessly and with no complications. Now the team is ready to fully put NOVA together to prepare for the final installation next month.

Connecting Piping to Node

Securing Top Node to Complete Module Frame




Completed Module Frame






Friday, September 15, 2023

NOVA | Winter Station Schematic Design

The team has begun work sketching out the framework and character for the upcoming 2024 Winter Station competition. Themed with Resonance, students were tasked with designing a winter pavilion that reflects the artistic legacy and lasting impact of TMU's past winter stations. Quoted directive from the competition organizers:

"Captures the echoes of our artistic legacy and the enduring impact of Winter Stations. It invites us to reflect on the moments that have left a lasting mark, the installations that have stirred our hearts, and the memories that have become part of our collective narrative."

While the aim was to resonate with the Winter Stations of the past, the team did not want to recycle past work, rather studying the fabrication methods and assembly techniques, while also refining, detailing and expediting the assembly time. The main Stations of inspiration were Snowcone, Lithoform, and S’winter Station. Certain features where carried through, such as triangular geometric patterning and the use of electrical conduit.


Initial Sketches

Students wanted to create a star to shed light and illuminate TMU's legacy. Incorporating prior materials and introducing 3D-printed elements allowed students to create a complete geometric structure. This was accomplished through a series of scaled models.

First "wing" Iteration
Without delay, students were faced with challenges. The problem with their initial design was having far too many 3D-printed nodes. This level of complication needs to be rectified. This iteration had close to 70 3D-printed parts; it was only feasible for the department to print 30.








Wednesday, July 26, 2023

Traverse - Assembly

 In anticipation of the on-site day, the fabrication team pre-assembled the essential components of the window display, ensuring seamless readiness for the day of installation.



Monday, June 12, 2023

Inhale | Exhale - Schematics + Prototypes

Upon receiving the task of creating an installation for the window display at the Eaton Centre on Yonge Street, two teams of students embraced the opportunity to design something captivating. They worked together to produce design concepts, which was subsequently presented for the Downtown Yonge BIA. 

This team presented the idea of an installation that consists of an array of vertically swaying sticks that create a gradual wave motion to match the ideal length of a breath.


Prototypes were later developed to get a sense of how the mechanics of the wheels and fins would work.



Thursday, June 1, 2023

MAB Installation - Assembly

 After finalizing the design, the plywood was precisely cut using the CNC machine, marking the next step in the fabrication process. With the base and wall pieces ready, the fabrication team began the construction of the modules. The modules were routed, sanded, and then painted before installing the LED lighting system.


Tuesday, February 7, 2023

2023 Winter Stations - First Canoe Completed!

 With the help of both the design and fabrication teams, the first canoe was completed successfully! This is one of the smaller modules of the project, and the team is currently working on CNC cutting the remaining components, and assembling the rest of the canoes. 






Friday, January 6, 2023

2023 Winter Stations - 1:1 Scale Prototype

 This week the 2023 Winter Stations design and fabrication teams created their first 1:1 scale prototype. The team used the intended material for the project, as well as the intended rivet connections. Additionally, the components were cut using the CNC router, allowing the team to get a realistic idea of construction time and method. 

From this prototype, some flaws were found with the interlocking connections, especially small gaps and openings caused by misalignment. From here, the designers can fine-tune the model digitally, in order to account for these imperfections realized through the testing process. 











Tuesday, May 9, 2017

Digital Media Experience Lab Locker Room

One of the projects the [R]ed[U]x Lab team had the privilege to participate in was the renovation of a space at the back of the Digital Media Experience Lab. Converting it from a small office to a locker room for the facility staff as well as students from the Masters of Digital Media program. Storing everything from coats and backpacks to microprocessors and printing filament, the facility had to securely store materials, make accessible resources for the lab, and inspire a sense of creative innovation. The [R]ed[U]x Lab team led by Liam, Arnel, and Erik pulled off a fairly ambitious proposal.