Showing posts with label matthew suriano. Show all posts
Showing posts with label matthew suriano. Show all posts
Sunday, October 5, 2014
Thanks to Everyone
Thanks to everyone from Ryerson University, FCAD, the Design Fabrication Zone, our generous hosts, the Bata Shoe Museum, and of course all the great volunteers who were instrumental in literally putting this project together! It proved to be a great success and we look forward to more initiatives like this in the future.
Labels:
[R]ED[U]X LAB,
Ailsa,
Bata Shoe Museum,
Blaine,
Design Fabrication Zone,
FCAD,
Filip,
Frank,
Kevin,
matthew suriano,
Nuit Blanche,
PFACS,
Rachel Law,
ryerson university,
Thanks,
Tiffany,
volunteers
Friday, October 3, 2014
Stomata: The Membrane Arises
After all the countless man-hours put into the cutting and assembly of the parametrically designed membrane of plastic, today marked the installation of the swaths on site at the Bata Shoe Museum. Despite the complexity, it would seem like the team had everything organized well as the majority was installed relatively quickly.
*The first image is courtesy of Rachel
*The first image is courtesy of Rachel
The Room Within A Room
Architects are stubborn.
Architects are creatures of habit.
Last year the teams faced a challenge in developing the space generously provided by the Bata Shoe Museum but without putting fasteners or marking the existing walls at all. The best option in that case was creating separators and structures offset from the existing building. This year the teams decided to step it up and... undertake a variation on the Room within a Room. This is no small task and though the vast majority of visitors to the installation will hardly take notice of the backdrop of the installation, it is critical in the overall effect.
Architects are creatures of habit.
Last year the teams faced a challenge in developing the space generously provided by the Bata Shoe Museum but without putting fasteners or marking the existing walls at all. The best option in that case was creating separators and structures offset from the existing building. This year the teams decided to step it up and... undertake a variation on the Room within a Room. This is no small task and though the vast majority of visitors to the installation will hardly take notice of the backdrop of the installation, it is critical in the overall effect.
Pneumatic Tests
Something that really does not come across in the still images of Stomata under construction is the pneumatic investigations Fil, Matt, and the rest of the team are undertaking. Here are a few video clips of the experiments with the inflatable materials, fans, and variable volume settings.
Parametricism, Physical Computing, and Lots of Plastic: Stomata Production
Despite what the final outcome will be of the Stomata Project, it is worth taking a look at some of the digital modeling and parametric workflows that developed the geometry of the installation.
Additionally, it is important to keep in mind the logistics and oversight of the physical computing required to make such installation work responsive.
Though all of the previous two components are critical in developing a strong design, the end result has to be fabricated, and in this case using a great deal of plastic and laser cutting...
Wednesday, October 1, 2014
Stomata In Progress
As Nuit Blanche is imminent, the Stomata group is readying their installation at the Bata Shoe Museum. Using the array of parametric modelling and fabrication tools, this year's pneumatic installation is quickly starting to shape up.
Subscribe to:
Posts (Atom)




















