Design is an iterative process, and every prototype brings the team closer to the final installation. This week the team continues testing, refining designs and collaborating to bring the installation one step closer to reality.
(Photos Taken By Andy Nguyen and Allie Male)
![]() |
Completed 1:6 Scale Model of the Kickoff Instillation |
In collaboration with the shop supervisors, the team troubleshoots, refining fabrication methods, testing connection details and preparing components using the CNC machine. At the same time, Project Leads Saad Malik and Jose-Miguel Calle manage material orders and project timelines, gaining valuable project management experience required for a large-scale installation.
Collaboration remains the heart of this project. Students have begun working alongside members of TMU's Engineering Department to develop and integrate the LED lighting system into the structure, ensuring the structure maintains the original design concept.
With each prototype and design review, students gain hands-on experience in fabrication, interdisciplinary collaboration, and iterative problem-solving. Each iteration provides new insight, allowing students to evaluate, improve and finalize the node and edge details before beginning fabrication of the full scale structure.
With the node and edge details finalized and fabrication underway, the team is ready to begin constructing the full-scale structure. Every prototype, meeting, and design revision has laid the foundation for the exciting work that is still to come.




.gif)



.jpg)
.gif)
No comments:
Post a Comment