With proper preparation and control over the geometries from the 3D model, the [R]ed[U]x Lab team was able to assemble the canopy and base cladding in relatively short time. The quick assembly also afforded the team a bit of time to get preliminary images taken to develop the lighting conditions in the final product.
No comments:
Post a Comment