The installation went smoothly and to plan. The team erected the station at Woodbine beach on February 15th, 2024. Even with the adverse weather conditions, the team did a great job of securing the footings into the sand, and connecting the station's structure onto the lifeguard stand concisely. Although the wind and temperature made the installation more difficult than expected, NOVA landed on the beach on time, and in its anticipated form.
Woodbine Beach |
Installed Just in Time Before the Snowstorm |
No comments:
Post a Comment