Thursday, June 8, 2023

MAB Installation- On-Site Production Day 1

 The fabrication team spent the first day on-site to assemble to installation. The day concluded with setting up the wall and base modules, as well as attaching the polycarbonate sheets on all sides. The lighting system was also programmed to end off the day. 





No comments:

Post a Comment