Wednesday, April 23, 2014

[R]ed[U]x Lab Installing at Grow Op 2014

The installation of Chlorophytum in the Grow Op 2014 show at the Gladstone Hotel is proceeding very well thanks to the hands on duty from first year all the way to third year. Assembling components on site sitting on a hardwood floor in a small room with people installing structure overhead is not the most enjoyable way to pass time between exams! The acrylic infrastructure suspended from the ceiling will provide an engaging canopy within part of the room.

Thanks to Steph for taking some candid photos during the initial install days!

 


















No comments:

Post a Comment