Tuesday, August 12, 2025

SOLAIR | Finalizing Frame Fabrication

Continuing assembly and preparing for installation. Through collaboration, the students screwed the wooden framework together. Once the framework was complete, the reflective panels were carefully attached, making sure there was a secure connection while allowing room for movement. The students assembled as many components as possible to minimize the amount of assembly on installation day.



Figure 1: Students worked together on the connections of the wooden framework. 

A group of people standing around a shelf

AI-generated content may be incorrect.

Figure 2: Students discussed the specifics of the reflective panel connection to the wooden framework.

Figure 3: Time-lapse of students assembling the wooden framework of Solair.


No comments:

Post a Comment