Saturday, June 11, 2022

Camp Winston Rejuvenation - Construction Day Two

The polycarbonate roof required students to employ accuracy and precision when measuring, cutting, and installing it. Due to unexpected warping in the wooden structure, students had to measure the dimensions of each roofing bay on the pavilion. Due to the weathering of the wood, students could not rely on the proportions given to them on the digital model. To verify that the polycarbonate sheets would span the necessary distance to provide a shelter underneath, students modified and measured each bay on site.





No comments:

Post a Comment