Friday, May 8, 2026

Kickoff 2026 I Design Development

Every successful installation begins with a single idea. For this project, that journey started with project leads Saad Malik and Jose-Miguel Calle, who began developing the initial sketches and concepts that would lay the foundation for the installation.

During the early planning stages, Saad and Jose explored different approaches for the node connections that would become the framework of this structure. They also investigated ways to integrate LED lighting into the design, ensuring that the installation would be both visually interesting and interactive. Through sketching, brainstorming, and testing ideas, the project began to take shape.

Initial Sketches From Saad's Sketchbook 


The first design for the installation aimed to mimic a kaleidoscope incorporating an open design that allows visitors to enter. The structure would use coloured translucent acrylic to reflect light.

Initial Design Concept with an Entrance 

Initial Design Concept with Kaleidoscope

The final design mimics the original geometry of the classical soccer ball using the truncated icosahedron. It will feature Alucobond reflective panels that act as a kaleidoscope that reflects like a gem within the structure.

Final Render of the Kickoff Instillation

Animation Showing Colour Changing Concept

As the school year came to an end in April, a team of students from first and second year came in to help turn this idea into reality.  Students worked together to develop the first physical model of the installation, working closely with the shop supervisors and each other to learn new skills. Using the shop's machinery and fabrication tools, students laser-cut and hand assembled the first physical model of the installation. These hands-on experiences allowed students to see how their designs would function in a three-dimensional space.

(Photos Taken By Andy Nguyen and Jorge Cruz Toro)
Students working together to construct the first model


The design continued to evolve as students refined details, tested new ideas, and improved upon earlier iterations. Through ongoing feedback and experimentation, the installation became more detailed and comprehensive with each revision.





Collaboration played a key role throughout the process. First- and second-year students worked side by side, sharing knowledge and learning new skills from one another. Together, they explored fabrication techniques, problem-solved design challenges, and gained valuable experience in both digital and physical creation.



With the groundwork established, the project entered its construction phase. Students began developing a more advanced physical model while simultaneously creating a detailed Rhino model to support the design process. These digital and physical prototypes will help guide the next stages of development as the installation continues to grow from concept to reality.

As the project moves forward, students remain committed to innovation, collaboration, and creative problem-solving. What began as a series of sketches has already transformed into a promising installation, and the team is excited to continue bringing their vision to life.


Monday, November 10, 2025

Camp Winston Sensory Yurt Furnishings | Final Imagery

Over the weekend, we successfully completed the installation of our custom sensory yurt furnishings at Camp Winston. It’s been a rewarding hands-on learning experience for the team and an even better bonding experience along the way. We can’t wait to see how the children engage with and enjoy the space this summer.

   


Sunday, November 9, 2025

Camp Winston Sensory Yurt Furnishings | On-Site Construction Process

Here are a few photos from our on-site construction process for the Camp Winston sensory yurt furnishings. We arrived Saturday morning and worked throughout the day, gluing, sanding, and securing the modular pieces together inside the space as everything came to life!



Monday, October 20, 2025

Camp Winston Sensory Yurt Furnishings | Fabrication and Testing

With the design finalized, the team has officially begun fabrication. One of the biggest challenges has been determining in the right amount of kerfing to balance structural stability with the desired curve radius and material thickness. After thorough testing, we’ve determined the proper CNC intervals and cut depths to achieve a smooth curve while keeping the piece strong. To ensure smooth, timely installation up north, we completed as much fabrication in-house as possible before heading to site.

We sprayed the kerfed pieces with water and used an iron to increase the flexibility of the wood while minimizing breakage.


Monday, September 22, 2025

Park(ing) Day 2025 | Final Images

We successfully completed Parking Day, and it was rewarding to see people interacting with the installation during the weekend activation. Developing the design as a team was a fun process, and the entire project became a valuable hands-on learning experience as the design came to life. 

(Photo taken by Jade Yu Tung Wong and Theo Tsang)




Friday, September 19, 2025

Park(ing) Day 2025 | Installation

The installation took place early in the morning and continued until noon. We started by building the base to fit the pre-assembled components. Once the base was secured, we connected the components while making final adjustments. It was exciting to see the project coming together!

(Photo taken by Mirko Garcia)